§ 19-52. Requirements.  


Latest version.
  • (a)

    No significant industrial user shall discharge wastewater into the WWF without first obtaining a wastewater discharge permit from the Administrator, except that an existing significant industrial user that has filed a timely application pursuant to this article may continue to discharge for the time period specified therein.

    (b)

    Any violation of the terms and conditions of a wastewater permit shall be deemed a violation of this article and subject the permittee to the sanctions and penalties of this article.

    (c)

    The Administrator may require any person discharging into the WWF to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization.

(Ord. No. 97-15, § 4(4.2), 9-15-97; Ord. No. 02-28, §§ 1, 7, 11-19-2002; Ord. No. 12-16, § II(Exh. A), 7-3-2012)