§ 19-193. Pretreatment requirements.  


Latest version.
  • The county may require pretreatment of industrial wastewater whenever necessary to reduce, modify, or eliminate the user's wastewater discharge to achieve compliance with applicable national pretreatment standards, or to meet any other wastewater condition or limitation. If required by the county, plans, specifications, and operating procedures for such wastewater pretreatment facilities shall be prepared by a registered professional engineer, and shall be submitted to the county for review. Prior to beginning construction of said pretreatment facilities, the user shall submit a set of final construction plans and specifications to the county. Prior to beginning construction, the user shall also secure such building, plumbing, or other permits that may be required. Following completion of construction, the user shall provide the county with "as built" drawings. Neither filing of the plans nor the issuance of permit(s) shall be construed to indicate that the county in any way vouches for or warrants the performance capabilities of any facilities constructed pursuant to such plans, specifications, or data. Subsequent alterations or additions to such pretreatment of flow-control facilities shall not be made without prior notice to the county.

(Ord. No. 04-4, § 20, 3-2-2004)